Site Establishment

Every great development has a beginning and this is where it all starts. By establishing the site, we are ensuring that all safety measures are in place to create a safe working site for everyone involved in the project. Read more
1
1

Demolition

Demolition in short, is the removal of existing structures in a safe and effective manner to prepare the site for the new construction activities. Read more
2
2

Bulk Earthworks

Bulk earthworks is essentially excavation of the site to required levels in preparation for the new construction activities. Upon completion of bulk earthworks construction of the building can commence. Read more
3
3

Sub - Structure & Services

Building footings and in ground services, such as drainage and stormwater are undertaken prior to preparation of ground floor or upper structural levels. Read more
4
4

Structure

Upon completion of sub structure and in-ground services construction commences on the main internal and external structural elements of the building which generally includes floors, walls and roofs for the building. Read more
5
5

Lock up

Upon completion of the building structure external cladding can commence which generally includes brickwork and other lightweight cladding materials and roof sheeting/tiles to enclose the building to security and weatherproof requirements. Cum sociis natoque penatibus et magnis dis parturient montes, nascetur ridiculus mus. Donec quam f... Read more
6
6

Rough-in

Upon Lock-up completion service trades commence installation of hydraulic, electrical, mechanical and communications services throughout the interior of the building Read more
7
7

Internal Linings

Upon completion of services trades wet area sealing and internal linings are installed to all walls and ceilings as required. Also at this time Joinery elements are installed prior to finishing trades Read more
8
8

Finishes and Fitoff

Upon completion of internal linings and joinery items finishing trades commence painting and tiling to areas as required. Fitoff of all plumbing and electrical/mechanical/security points occurs upon completion of painting/tiling as required Read more
9
9

Special Finishes

Some areas of the building may require special finishes such as carpet, timber floors and or window furnishings. These elements are completed after completion of all other trades and may also be completed after a Certificate of Occupancy is issued by the Building Certifier Read more
10
10

External Works

Concurrent with Finishes and Fitoff of internal materials external works such as pavements, paths, driveways, fences and soft landscape are undertaken Read more
11
11

Certificate of Occupancy

Upon all the internal and external building works being completed and inspected to the satisfaction of consultants and or relevant Authorities the Building Certifier will issue a Final Certificate which enables the builder to apply for a Certificate of Occupancy (C of O). Issuance of the C of O by the Planning Authority enables the purchaser to settle on the property and move in as required. Read more
12
12